EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
MattJ
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (116)
Research
- (2)
Workshop
- (5)
Empennage
- (5)
Fuselage
- (16)
Firewall
- (4)
Tail Feathers
- (1)
Wings
- (7)
Controls
- (8)
Avionics
- (10)
Lighting
- (2)
Instrument Panel
- (1)
Landing Gear
- (7)
-
Finish Brake System
-
Brake Lines
-
Finishing up Gear...
-
Initial Landing gear...
-
Take Apart the...
-
Spats (Wheel Pants)...
-
Assemble the Gear Parts
Engine
- (12)
Propeller
- (2)
Fuel System
- (6)
Interior Finish
- (11)
Paint / Decals
- (8)
Inspection
- (3)
Tools
- (2)
Cabin AIr
- (4)
Builder Name:
Matt Jakus
-
Project:
The Airplane Factory - Sling TSi
-
VIEW REPORTS
Total Hours:
1190.7
Start/Last Date:
Dec 01, 2019 - Jan 29, 2023
Engine:
Rotax 915is
Panel:
Garmin 3X
Friendly URL:
https://eaabuilderslog.org?s=MattJ
Home or Last Project Picture
Jun 16, 2020
Assemble the Gear Parts
- (24.5 hours)
Category: Landing Gear
Assembled the main wheels and mounted to main gear strut.
20200615_134423.jpg
20200615_134429.jpg
20200616_121721.jpg
20200616_123754.jpg
20200616_123826.jpg
20200613_132318.jpg
20200616_121721.jpg
20200619_133900.jpg
20200619_133903.jpg
20200624_131640.jpg
20200625_110740.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.